Project Description
This project will provide a new shared use path along the east side of US 29 between Carrsbrook Drive and Seminole Lane. The new 10-foot wide shared use path will replace the existing sidewalk and provide improved bicycle and pedestrian accommodations.
Cost Estimate
Preliminary Engineering ....................................$0.8 million
Right of Way Acquisition ....................................$1.5 million
Construction .............................................$1.5 million
Needs Addressed
![Ped_access Ped_access](https://campo.tjpdc.org/wp-content/uploads/ped_access.png)
Pedestrian Access
![Cycle Bicycle Access](https://campo.tjpdc.org/wp-content/uploads/cycle.png)
Bicycle Access
Outstanding Concerns
No known concerns at this time