Project Description
The project would result in a displaced left-turn for traffic traveling east on US250 and turning north onto Louisa Road. The intersection will likely be signalized. Existing traffic signals will be rebuilt.
Needs Addressed
![Safety Safety](https://campo.tjpdc.org/wp-content/uploads/safety.png)
Safety
![Cycle Bicycle Access](https://campo.tjpdc.org/wp-content/uploads/cycle.png)
Bicycle Access
![Cycle Bicycle Access](https://campo.tjpdc.org/wp-content/uploads/cycle.png)
Pedestrian Access
Preliminary Cost Estimate (does not include inflation)
$8.3m
Outstanding Concerns
No known concerns at this time.
Contact
Kevin McDermott (kmcdermott@albemarle.org)
Jessica Hersh-Ballering (jhballering@albemarle.org)
Entity Submitting
Albemarle County or Thomas Jefferson Planning District Commission